Traffic will shift on Spout Springs Widening Project Next Week
The Georgia Department of Transportation (GDOT) announces that on Tuesday, September 15, traffic will shift over along Spout Springs Road between Capitola Farm Road and Lake Sterling Boulevard. This 900-foot shift will move traffic over approximately 7 feet to the left headed south. This shift will allow construction crews to mobilize equipment and begin building a retaining wall on the project. Lane closures on this project are allowed between 9am and 2:30pm and then at night from 7pm until 6am. Please slow down when driving through this work zone and drive alert.