Hall County Road scheduled for Maintenance

The Georgia Department of Transportation (Georgia DOT)  will be doing slab replacement and spall repair in Hall County from 8am until 3pm, August 8-11, 2022, weather permitting.  It takes place on I-985 between northbound mileposts 11-13. The right lane will be closed during this time.  Motorists are cautioned to reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions by calling 511, visiting 511ga.org, or downloading the Georgia 511 app.