Nightly Lane Closures begin on State Route 98 for Resurfacing

The Georgia Department of Transportation (GDOT) and construction partner E.R. Snell will begin construction on the State Route (SR) 98 resurfacing project.  Nightly single lane closures will be from 6pm to 6am beginning April 30. The project has an estimated completion date of late October 2020.  The State Route (SR) 98 lane closures will begin south of State Route (SR) 164 and extend to State Route (SR) 52, stretching approximately 5.76 miles.  GDOT maintenance offices conduct regular Pavement Condition Evaluation System (PACES) assessments to monitor pavement conditions on routes maintained by the Department. This resurfacing project was selected by the District Maintenance Office based on the current low PACES rating. Such resurfacing projects are designed to enhance and preserve existing pavement by decreasing the formation of potholes and cracks in areas of the roadway where pavement has deteriorated.  Exact dates may change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions by calling 511, visiting 511ga.org, or downloading the Georgia 511 app.