DOT Work Slated for This Week

According to the DOT weekdays this week between 7am and 5pm  a crew will repair the ruts that have developed at the edge of pavement alongside SR 2/US 76 and SR 197. The intersections on SR 2/US 76 and SR 197 will be swept and driveways will be serviced. This work requires the shoulder of the roadway be closed as work occurs.